bookJan 19, 2026Closed access
TBM Tunnelling in Jointed and Faulted Rock
Indexed incrossref
Abstract
This practical guide describes the stage-by-stage development of a method for predicting the penetration rate (PR) and the advance rate (AR) for tunnel boring machines based on an expanded version of the Q-value, QTBM. The author analyzes 145 TBM tunnels that total 1,000km in length. He then develops simple formulae to estimate PR and AR from the QTBM value and to back-calculate QTBM from performance data. The book quantitatively explains actual advance rates as high as five m/hr for one day or as low as 0.005 m/hr for several months. It also covers logging methods, empirical TBM tunnel support design, and numerical verification of support.
Citation impact
238
total citations
- FWCI
- —
- Percentile
- 100%
- References
- 0
Citations per year
Authors
1Topics & keywords
Topics
Keywords
- Quantum tunnelling
- Penetration rate
- Tunnel boring machine
- Stage (stratigraphy)
- Geology
- Geotechnical engineering
- Engineering
- Forensic engineering
No related works found for this paper.