Abstract

This practical guide describes the stage-by-stage development of a method for predicting the penetration rate (PR) and the advance rate (AR) for tunnel boring machines based on an expanded version of the Q-value, QTBM. The author analyzes 145 TBM tunnels that total 1,000km in length. He then develops simple formulae to estimate PR and AR from the QTBM value and to back-calculate QTBM from performance data. The book quantitatively explains actual advance rates as high as five m/hr for one day or as low as 0.005 m/hr for several months. It also covers logging methods, empirical TBM tunnel support design, and numerical verification of support.

Citation impact

238
total citations
FWCI
Percentile
100%
References
0
Citations per year

Authors

1

Topics & keywords

Keywords
  • Quantum tunnelling
  • Penetration rate
  • Tunnel boring machine
  • Stage (stratigraphy)
  • Geology
  • Geotechnical engineering
  • Engineering
  • Forensic engineering
No related works found for this paper.